Location: China / Uzbekistan (customizable)
For this large river-crossing bridge construction, we supplied a specialized segment lifting system designed for high-elevation installation of massive bridge components.
The solution included custom truss lifting frames, high-strength wire rope systems, and synchronized lifting controls, ensuring stability and precision during吊装.
Project Highlights:
- Successfully completed high-altitude installation of oversized bridge segments
- Shortened construction period by 18%
- Greatly improved on-site safety and lifting stability
- Adapted to harsh environments and continuous heavy-duty operation