{"id":167,"date":"2025-11-01T07:03:10","date_gmt":"2025-11-01T07:03:10","guid":{"rendered":"https:\/\/eyuncranes.com\/?p=167"},"modified":"2025-11-21T06:32:27","modified_gmt":"2025-11-21T06:32:27","slug":"bridge-segment-lifting-for-river-crossing-project","status":"publish","type":"post","link":"https:\/\/eyuncranes.com\/en\/bridge-segment-lifting-for-river-crossing-project\/","title":{"rendered":"Bridge Segment Lifting for River-Crossing Project"},"content":{"rendered":"\n<p><strong>Location:<\/strong> China \/ Uzbekistan (customizable)<\/p>\n\n\n\n<p>For this large river-crossing bridge construction, we supplied a <strong>specialized segment lifting system<\/strong> designed for high-elevation installation of massive bridge components.<br>The solution included <strong>custom truss lifting frames<\/strong>, high-strength wire rope systems, and synchronized lifting controls, ensuring stability and precision during\u540a\u88c5.<\/p>\n\n\n\n<p><strong>Project Highlights:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Successfully completed high-altitude installation of oversized bridge segments<\/li>\n\n\n\n<li>Shortened construction period by <strong>18%<\/strong><\/li>\n\n\n\n<li>Greatly improved on-site safety and lifting stability<\/li>\n\n\n\n<li>Adapted to harsh environments and continuous heavy-duty operation<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Location: China \/ Uzbekistan (customizable) For this large river-crossing bridge construction, we supplied a specialized segment lifting system designed for high-elevation installation of massive bridge components.The solution included custom truss lifting frames, high-strength wire rope systems, and synchronized lifting controls, ensuring stability and precision during\u540a\u88c5. Project Highlights:<\/p>\n","protected":false},"author":1,"featured_media":710,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-167","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case"],"_links":{"self":[{"href":"https:\/\/eyuncranes.com\/en\/wp-json\/wp\/v2\/posts\/167","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eyuncranes.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eyuncranes.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eyuncranes.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/eyuncranes.com\/en\/wp-json\/wp\/v2\/comments?post=167"}],"version-history":[{"count":2,"href":"https:\/\/eyuncranes.com\/en\/wp-json\/wp\/v2\/posts\/167\/revisions"}],"predecessor-version":[{"id":711,"href":"https:\/\/eyuncranes.com\/en\/wp-json\/wp\/v2\/posts\/167\/revisions\/711"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eyuncranes.com\/en\/wp-json\/wp\/v2\/media\/710"}],"wp:attachment":[{"href":"https:\/\/eyuncranes.com\/en\/wp-json\/wp\/v2\/media?parent=167"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eyuncranes.com\/en\/wp-json\/wp\/v2\/categories?post=167"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eyuncranes.com\/en\/wp-json\/wp\/v2\/tags?post=167"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}