Title:
🚧 Launching Girder Achieves Major Milestone in Highway Bridge Construction
Content:
Our latest 900-ton launching girder system has successfully completed a key segment lifting and placing operation on a major expressway bridge project.
Designed for long-span concrete girder erection, this advanced equipment integrates high-strength truss structures, synchronized lifting trolleys, and intelligent safety monitoring.
During the operation, the launching girder demonstrated excellent stability and precision, placing each segment smoothly and safely across complex terrain. The modular design allowed rapid shifting between piers, significantly improving construction efficiency.
Highlights:
- High-precision synchronized lifting systems
- Modular structure enabling fast span-by-span installation
- Excellent performance under strong wind and high-temperature environments
- Increased project installation efficiency by over 25%
This milestone marks another successful application of our launching girder technology in large-scale highway and railway bridge projects worldwide.